BCO East Anglia Talk & Tour: Cambourne Building 2020
The BCO East Anglia Committee invite you to a tour of Building 2020 on the Cambourne Park Science and Technology Campus. This newly fitted laboratory and write up space is just 7 miles from the University of Cambridge West Campus offering some of the best value science and technology space in the Cambridge market. Cambourne Park Science & Technology Campus is set within 50 acres and is already home to several exciting technology and medical device companies designing and delivering innovative solutions for some of the world’s biggest challenges.
The specification includes:
• Open plan laboratories
• 6 air changes per hour (minimum)
• Mix of fixed (perimeter) and mobile (peninsular) benching
• Temperature range from 20C +/- 2C
• Lab sink with taps and drainer
• Ducting for fume cupboards
• Power and data run in dado trunking above and below laboratory benching
• Piped gases (Nitrogen, Oxygen and Compressed Air) provided from a central gas store
• Separate lab water system
• New kitchenette/tea point in reception
• Electric car charging points
• Car parking ratio 1:250 sq ft